Virginia Master Electrician Exam Exam Prep
Free practice questions

Free VA-ME Practice Questions

10 exam-style questions with answers and explanations, straight from our 1,030-question bank. Tap an answer to check yourself. When you're ready, take the scored version in the free practice test.

Start the free practice test → ★★★★★4.9/5 from 2,400+ candidates · No signup

The VA-ME exam has 90 questions and runs 4 hours 30 minutes.

These 10 free VA-ME questions are organized by exam domain, so you can see how each part of the Virginia Master Electrician Exam blueprint is tested. Reveal the answer and explanation under each question.

Domain 1: Standards of Practice

Question 1

A Virginia Master Electrical tradesman forms an LLC to contract for work that requires a Virginia contractor business license. The owner plans to rely only on the individual tradesman license. Which statement is correct?

Show answer & explanation

Correct answer: D - The individual credential does not license the LLC; the business must obtain the required contractor license

Domain 3: Renewal and Reinstatement

Question 2

A Virginia Master Electrical license expired 14 months ago. The holder completed the required continuing education and has not worked while expired. Under current Virginia rules, the next step is to:

Show answer & explanation

Correct answer: C - Apply for reinstatement and remain inactive until the license is restored

Domain 7: General Electrical Knowledge

Question 3

A 480Y/277-volt panelboard faces a grounded concrete wall, and its live parts are accessible from the front for servicing. What minimum clear working-space depth is required?

Show answer & explanation

Correct answer: B - 3.5 feet

Domain 9: Electrical-Electronic Fundamentals

Question 4

In a 120/208-volt, 3-phase, 4-wire office system, the phase currents are nearly balanced, yet the neutral current is unexpectedly high. Most of the connected load consists of switch-mode power supplies. The most likely explanation is:

Show answer & explanation

Correct answer: A - Triplen harmonic currents are in phase and add in the neutral

Domain 10: Branch Circuits

Question 5

A 240-volt, 30-ampere receptacle is installed in the laundry area of a dwelling supplied by a 120/240-volt single-phase system. Under the 2020 NEC, the receptacle requires:

Show answer & explanation

Correct answer: C - GFCI protection but not AFCI protection

Question 6

During replacement of one receptacle on a 120/240-volt multiwire branch circuit, removing the device opens the shared neutral to downstream loads. The breakers already provide an identified common disconnect. The proper correction is to:

Show answer & explanation

Correct answer: B - Pigtail the neutral to preserve downstream continuity

Domain 11: Service and Feeders

Question 7

A 120/240-volt dwelling qualifies for the optional calculation method. Its non-HVAC subtotal is 32 kVA. A 5 kW heat-pump compressor can run simultaneously with 12 kW of supplemental electric heat. What calculated load and minimum standard service rating result?

Show answer & explanation

Correct answer: B - 31.6 kVA and 150 amperes

Question 8

During a one-family dwelling service upgrade, the existing service disconnect will remain indoors nearest the conductor entrance. Available fault current is 18 kA. Select the addition that meets the 2020 NEC emergency-disconnect requirement.

Show answer & explanation

Correct answer: D - A readily accessible, properly marked 22 kA outdoor disconnect

Domain 12: Grounding and Bonding

Question 9

A single rod grounding electrode measures 32 ohms to earth. A second rod is installed 8 feet away, and the pair measures 28 ohms. What does the NEC require solely because the combined resistance remains above 25 ohms?

Show answer & explanation

Correct answer: A - No third rod is required by the two-electrode rule

Question 10

At a building supplied from an outdoor service disconnect, an electrician installs the bonding screw in the downstream distribution panel and also lands an equipment grounding conductor there. Correct the panel by:

Show answer & explanation

Correct answer: C - Removing the screw, isolating the neutral, and retaining the bonded equipment-grounding path

The rest of the VA-ME blueprint

The VA-ME exam also covers these domains. Drill them in the full free practice test:

That's 10 of 1,030

The full bank has 1,020 more VA-ME questions with explanations.

Continue in the free practice test →

View plans